Accelerating Inception to Shovel-Ready Data Centres

We target and de-risk strategic land opportunities adjacent to 11kV, 33kV and 132kV primary substations. Our technical due diligence with proprietary software and site masterplanning deliver bankable, grid-viable development sites for institutional infrastructure funds.

Explore Active Pipeline
TARGET CAPACITY ≤ 50 MW
DELIVERY PATHWAY Inception to Shovel-Ready SPV

Institutional Origination Pillars

Our structured infrastructure origination methodology transforms raw strategic land into bankable, shovel-ready digital infrastructure assets.

01 11kV, 33kV & 132kV Primary Substation Proximity

Strategic Substation Screening

Direct proximity to 11kV, 33kV and 132kV primary substations, evaluated for future distribution headroom and fault levels to support <= 50 MW.

Explore
02 Planning Performance Agreements

Statutory Planning Certainty

Targeting allocated employment land (with legal rights) and brownfield sites aligned with NPPF Critical National Infrastructure for fast-track directives.

Explore
03 Hybrid cooling and co-located power

Water Feasibility and on-site BESS

Evaluating sustainable water approaches and use of dual-loop closed circuits/hybrid cooling approaches to adhere to noise regulations and a PUE < 1.2

Explore
04 Improving local communities

Net Zero and Circular Economy

Embedding Net Zero approaches and re-use (waste materials, rubble or locally sourced materials) to create a local, vibrant economy - aiding and improving areas in line with council requirements

Explore
Opportunity Ref: UK-CONF-01 Engaging landowners to agree site plot details
Available Under Institutional NDA

Strategic Land Acquisition Opportunity

UK Strategic Transmission Axis • Location Disclosed Under NDA

Confidential UK-CONF-01 campus architectural masterplan and transmission boundary envelope
Target Power Range Up to 50 MW
Interconnect Voltage Targeting 132kV
Grid Operator (DNO) NGED
Substation Route Sub-1km Dedicated Corridor
Site Area 30 – 60 Acres Unencumbered
Grid Feasibility Desktop grid feasibility defined - NGED network
Target Milestone Target Shovel-Ready (Grid Dependent)
Opportunity Ref: UK-MIDLANDS-02 Grid Feasibility Validated - NGED engaged
Available Under Institutional NDA

Midlands Edge & Sovereign Compute Facility

Midlands Strategic Axis • Location Disclosed Under NDA

Target Power Range Up to 2 - 10 MW
Interconnect Voltage 11kV Dual Feeder Primary Interconnect
Grid Operator (DNO) NGED
Substation Route Sub-4km along existing roads
Site Area 50,000 sqft facility with yard space. B8 planning permission.
Grid Feasibility Grid Feasibility Validated - NGED engaged
Target Milestone Target Shovel-Ready (Grid Dependent)
Opportunity Ref: UK-MIDLANDS-03 Grid Feasibility Validated - NGED engaged
Available Under Institutional NDA

Midlands High-Power Business Park Facility

Midlands Strategic Axis • Location Disclosed Under NDA

Target Power Range Up to 10 - 15MW
Interconnect Voltage 11kV or 33kV Dual Feeder Interconnect
Grid Operator (DNO) NGED
Substation Route Sub-1km along existing roads
Site Area 50,000 sqft facility with yard space in a new business park. B8 planning permission.
Grid Feasibility Grid Feasibility Validated - NGED engaged
Target Milestone Target Shovel-Ready (Grid Dependent)

Origination & De-risking Framework

Data-led analysis of sites with proprietary tooling. We don't "scatter-gun" hit random sites. We target where power is available.

STAGE 01 DELIVERABLES
Target Window: Month 0 – 2

Substation & Grid screening

Report with fault headroom, future demand growth and thermal capacity analysis (all nodes in chain)
Upstream and downstream queue demands.
Bespoke GIS Spatial Polygon Overlay & Environmental Constraint Mapping (1:2500 scale)
Substation Physical Busbar Buffer & Wayleave Review (Route feasibility)
De-risking Benchmark: 100% avoidance of flood zones, SSSI, and green belt encumbrances